Global
Monomers

Welcome to the Ludwigshafen site


Do you want to pick up materials, listed below at the Ludwigshafen site?

The following information will assist you in planning.

 
   
5-10 days before loading   You will receive information for registration of your pickup by E-Mail.
2 days before loading   

Please register your pickup directly with this form. You will then receive the loading reference from us. 

No pickup possible without loading reference.

On the day of loading

 

 
  • You can check in with loading reference between 6 am and 3 pm at Abfertigung Nord (BASF SE Sewage Treatment Plant).
  • Before loading, the vehicle as well as the safety and hazardous materials equipment is inspected. Transporting hazardous materials requires a valid ADR license.
  • An ECD cleaning certificate is also mandatory. The certificate may not be older than 3 days.
  • Loading takes place at loading station F300. The loading station closes at 4 pm.
  • For navigation to loading stage you can use App NaviLU.
Previous load  

Please note the impermissible/permissible previous load when transporting propylene glycol and dipropylene glycol.

 
 

 

5-10 days before loading   You will receive information for registration of your pickup by E-Mail.
2 days before loading  

Please register your pickup directly with this form. You will then receive the loading reference from us. 

No pickup possible without loading reference.

On the day of loading

 

 
  • You can check in with loading reference between 6 am and 3 pm at Abfertigung Nord (BASF SE Sewage Treatment Plant).
  • Loading takes place at other loading station, you will receive details after registration.
  • Before loading, the vehicle as well as the safety and hazardous materials equipment is inspected. Transporting hazardous materials requires a valid ADR license.
  • Please remember to use anti-slip mats (9 mats per pallet, minimum size of 20x30 cm).
  • For navigation to loading stage you can use App NaviLU.

 
   
24 hours before loading   

Please register your pickup directly with this form or with your BASF contact person. You will then receive the loading reference from us.

On the day of loading

 

 
  • You can register between 6 am and 3 pm at Abfertigung Nord (BASF SE Sewage Treatment Plant). 
  • Following registration, the vehicle as well as the safety and hazardous materials equipment is inspected. Transporting hazardous materials requires a valid ADR license.
  • Loading takes place at loading station U050. The loading station closes at 3 pm.
  • For navigation to loading stage you can use App NaviLU.

     
5-10 days before loading  

You will receive information for registration of your pickup by E-Mail.

2 days before loading   Please register your pickup directly with this form. You will then receive the BASF loading reference from us. No pickup possible without loading reference.

On the day of loading

 

 

  • You can check in with loading reference between 6 am and 3 pm at Abfertigung Nord (BASF SE Sewage Treatment Plant).
  • Before loading, the vehicle as well as the safety and hazardous materials equipment is inspected. Truck driver needs valid ISOPA and ADR licenses.
  • An ECD cleaning certificate is also mandatory. The certificate may not be older than 3 days.
  • Loading takes place at O120. The loading station closes at 3.30 pm.
  • For navigation to loading stage you can use App NaviLU.
Permissible previous loads   Permissible previous loads
Notes on equipment  
  • Equipment must be ISOPA conform.
  • Cleaned tank:
    ECD cleaning certificate and dew point certificate mandatory. Certificates may not be older than 3 days.
  • Empty / Uncleaned tank:
    Please note the permissible previous loads. 

Visit us at K 2022